March 24, 2009 1:33PM
The Meadowbrook and Casco Bay Garden Railway began it's 2009 operation today at the noted time. Trolley track was clear of snow and debris. Track was cleaned and off they went, Mighty Macks and Eggliners
We are G-Scale model railroad club, and our trains run outdoors in the garden. Our best known activity is the annual Holiday Train Display...
One of my brothers called from Colorado this morning to say that today is the 60th anniversary of the California Zephyr, one of the country's premier long-distance trains. The Zephyr ran from Chicago to San Francisco over the Burlington, Rio Grande, and Western Pacific railways. The usual consist included eleven stainless steel Budd cars, five of them with vista domes. I traveled on the Zephyr between Grand Junction, Colorado and San Francisco when I was in college. The $50 trip took 28 hours, most of which I spent in a vista dome. There never was a better way to travel. The last Zephyr made the journey on March 21, 1970, sixty years to the day from its first trip.




From our member Denneth 'tiny' Lee in New Hampshire who sends us this excellent reference for Bridges in the United States. Thank you! http://bridgehunter.com/

I molded the windows using a silicone mold and Urethane resin. they came out OK but I do have trouble getting all the mullions to fill properly. many windows have patches but they do not show too much.



Tiny sent me this picture of a wild Maine Moose. I do not have all the details but I know all this snow is having a bad effect on our abilities to think clearly. We may need to get out more. I am thinking about driving to Milford to see the NH Clubs layout plus 'live steam' 7/8 scale, plus others. If your interested in seeing that show and we can hook up conveniently you are welcome to join me for the ride. Use the gadget at the bottom of the blog to contact me for details.
This roof is copper "flashing" from Lowes. it is not the real thing...copper sheet but is copper foil bonded to a plastic backing. I wish it was self adhesive-peel and stick but it is not. As the material came in a 12" wide roll, I had to cut 13" wide sections which overlapped to cover each side of my 30 x 13 roof.
I got lucky this afternoon and resting with a cold, I stumbled onto a marathon of 'Extreme Trains' History Channel, (in fact running 2 or 3 more episodes right now). I was enjoying the Union Pacific 844 and they went up to the cab and watching the engineer blow the whistle at an up coming grade crossing. So here is an easy one (except I did not know for sure) What is the long and short pattern for the whistle?
Here is a photo of the "mill" I have been working on. It utilizes the windows I showed off a couple of weeks ago.