Sunday, October 29, 2017
Neville Lewis G Scale Sale Table at Topsham Show on November 4th
Neville Lewis will have a table at the Fall Model Railroad Show this coming Saturday from 10am-3pm. He will have engines, accessories and track for sale. The show is at the Mt Ararat High School Gym, 73 Eagles Way, Topsham, ME 04086.
Tuesday, October 24, 2017
8th Annual Holiday Train Display will run from Nov 17 through Dec 24
Our train display at the
Maine Mall will run from November 17 through December 24. We are back beside Santa in the old Bon Ton space. The layout is 16’ wide by 60’ long with
nine trains. This year we have a mountain with a train around it halfway up and
the ski lift running up to the top.
Please sign
up to help at the Mall to provide fun for children of all ages. We have 17
shifts open in November and 33 in December. You can click the SignUp button on the blog or contact
Sam Carr at secarr1@comcast.net or 207-865-4467. You can also use the Sign Up button to view the current
schedule.
The shifts are as follows:
· November 17 to December 14: Monday
through Saturday 10am-3pm or 3-8pm. Sunday 10am to 6pm single shift
· December 15 to 23 from 9am-3pm or
3pm-9pm
· December 24 from 9am-1pm or 1pm-5pm
Thanks to those who
already signed up including Mike Tarbox, Preston Chadwick, John Middleton, Art
Handman, Norm Waycott, Andy Hendrickson, Bill & Robin Goodrich, Ben
Braithwaite, Dennis Farrell and Sam Carr.
Labels:
Maine Mall Train Display,
Special Events
Tuesday, October 17, 2017
Setup Day Two at the Maine Mall
Today we finished the track on the 30" platforms. Dennis & Ben finished the two main loops while Terry and Courtney worked on running the wiring. The outer main line has run a train!!
Ben and Sam ran the trolley tracks on the Mountain Platform. It was adjusted to run around the Mountain to the base of the Ski Lift. This will leave an area open for buildings and avoid having the trolley running under the ski lift cable.
The Ski Lift will have button #5
Setup will resume on Thursday to test the tracks, wire the mountain track, and put the mountain in its final position. Buildings and decoration will start on the Thomas/Percy and Town Platforms. The Mall will be doing final touch up on the weekend, so buildings on the Mountain Platform will wait until next week as will the water feature track and buildings.
Here is the current plan showing the Percy Figure 8 (thanks to Art Shean) and the changes in the trolley around the Mountain (thanks to Terry).
![]() |
Percy changed from Oval to Figure 8
|
Labels:
Maine Mall Train Display,
Special Events
Monday, October 16, 2017
MGRS at Mt. Ararat Show in Topsham on November 4th
MGRS will have a layout display at the Model Railroad Show sponsored by the Great Falls Model Railroad Club on November 4th. We will be using Art Shean's portable layout that you may have seen at the Annual Meeting in July.
The show takes place from 10am-3pm at the Mount Ararat High School Gym, 73 Eagles Way, Topsham, ME 04086.
We need help setting up starting at 4pm on Friday, 11/3, and during show on Saturday. If you can help, please contact Sam at secarr1@comcast.net.
The fall and spring Mt. Ararat events are the largest, regular model train show in Maine. Its worth your time to help MGRS, recruit new members, and have a chance to talk to other model railroaders.
The show takes place from 10am-3pm at the Mount Ararat High School Gym, 73 Eagles Way, Topsham, ME 04086.
We need help setting up starting at 4pm on Friday, 11/3, and during show on Saturday. If you can help, please contact Sam at secarr1@comcast.net.
The fall and spring Mt. Ararat events are the largest, regular model train show in Maine. Its worth your time to help MGRS, recruit new members, and have a chance to talk to other model railroaders.
Setup Day One at the Maine Mall
Today was our first day of setup at the Mall. The trailer was unloaded on Friday, and our equipment is in secure storage near the layout. The Mall Staff had already placed the tables and covered them with white cloth that looks like snow.
The crew today included Andy Hendrickson, Ben Braithwaite, Terry Norton, Dennis Farrell, Art Shean, and Sam Carr.
This picture looks across the train platform. The mountain built by the Mall is in the center. You can see the Jackson Drawbridge towers on the right and two other bridges on the left. By this time the crew had adjusted the tables to fit the bridges with help from Paul Pettengill of the Mall.
The crew today included Andy Hendrickson, Ben Braithwaite, Terry Norton, Dennis Farrell, Art Shean, and Sam Carr.
This picture looks across the train platform. The mountain built by the Mall is in the center. You can see the Jackson Drawbridge towers on the right and two other bridges on the left. By this time the crew had adjusted the tables to fit the bridges with help from Paul Pettengill of the Mall.
Looking from the back across the Town, Mountain and Circus Areas
Here you can see Terry and Ben working on the mountain before we put it up on the table. They are fitting the top of the Ski Lift into place and making sure we can still take off the cover. The mountain has a ski slope down the front and a train going around it about half way up. Both will be operated with push buttons.
Setting the Ski Lift on the Mountain
This 3rd picture shows the setup of the Jackson Drawbridge and the picket fence along the back. This fence will go around the part of the layout with the 30" platform. The 12" Thomas & Percy area will have the short, white fence as in past years.
Jackson Drawbridge and Picket Fence
By late afternoon the four bridges and most of the track were in place. Andy & Dennis worked on the Main Lines and Circus. Art Shean laid the track for Thomas & Percy. Terry & Ben set the bridges, tested the Mountain train line, and started the wiring.
On Tuesday Terry and Courtney Goodwin will be working on the wiring while the rest of the crew works on the last of the main line track. Then the Mountain will be put into its final position so the trolley line can be run around it.
Later this week we expect to start on roads and buildings.
Labels:
Maine Mall Train Display,
Special Events
Friday, October 13, 2017
Mall Setup starts October 16 and Layout Opens November 17
The trailer has been unloaded at the Mall. Setup will begin on Monday, October 16 at 10am. The plan is to lay track and wire up from Monday through Wednesday, and then start placing buildings and decorations. The tables are in place and covered with a white "snow" cloth. MGRS will open along with Santa on Thursday, November 17, and the layout will run through December 24th
Please come in during the week and donate some time and energy to making this one of our biggest layouts. Enter through the sliding glass doors on the mall side of BONTON's near where we were last year.
From 11/17 through 12/14
Monday through Saturday Noon to 8pm with shifts 10am-3pm and 3-8pm
Sunday 10am to 6pm single shift
From December 15 to 23
9am to 9pm with shifts 9am-3pm and 3pm-9om
December 24
9am to 5pm with shifts 9am-1pm and 1pm-5pm
Please come in during the week and donate some time and energy to making this one of our biggest layouts. Enter through the sliding glass doors on the mall side of BONTON's near where we were last year.
Volunteer to run trains during the hours below
From 11/17 through 12/14
Monday through Saturday Noon to 8pm with shifts 10am-3pm and 3-8pm
Sunday 10am to 6pm single shift
From December 15 to 23
9am to 9pm with shifts 9am-3pm and 3pm-9om
December 24
9am to 5pm with shifts 9am-1pm and 1pm-5pm
Saturday, October 7, 2017
Mall Setup to Start During the Week of October 16-20
Setup of the 2017 Holiday Train Display may start during the week of October 16-20. The display will be with Santa in the space previously occupied by the Bon Ton store. This area will note open to Mall visitors until Santa beings his work in November.
Details to follow after a Board of Directors meeting during the week of October 9-13.
Details to follow after a Board of Directors meeting during the week of October 9-13.
Monday, October 2, 2017
Holiday Train Display Update
Here is the updated plan for the Mall. The layout is now 16 feed wide. Thomas is now 1' high and has expanded to 12' deep. Santa may start as early as November 4th. Our schedule is not yet set.
Phillips Model Railroad and Hobby Show on September 30th
Here are some pictures of the G-Scale layout at the show in Phillips this past weekend. Art Shean and Jim Jenkins did a nice job with this. Several MGRS members showed up to see what was happening. Art believes we will be invited back next year
Thursday, September 28, 2017
MGRS Trains in Phillips Sept 30 and Topsham Nov 4
We will have G Scale Trains running at the Model Railroad & Hobby Show in Phillips this coming Saturday, September 30th from 9am to 3pm. Phillips is the home of the Sandy River & Rangeley Lakes narrow gauge railroad.
Art Shean will have his portable layout up and running at the show. Jim Jenkins will be helping him.You may have seen the layout at the Summer Outing in Buxton. The Event and SS&RL ride information is at http://www.srrl-rr.org/operating-schedule/
Location is the Phillips Area Community Center at 21 Depot Street, Phillips, Maine.
The layout will also be at the Great Falls Model Railroad Show on Saturday, November 4th at the Mt. Ararat High School Gym, 73 Eagles Way, in Topsham from 10am-3pm. If you can help set it up on Friday, 11/3 at 4pm or at the show on Saturday, please contact Sam.
Here is the plan for Phillips Show.
Art Shean will have his portable layout up and running at the show. Jim Jenkins will be helping him.You may have seen the layout at the Summer Outing in Buxton. The Event and SS&RL ride information is at http://www.srrl-rr.org/operating-schedule/
Location is the Phillips Area Community Center at 21 Depot Street, Phillips, Maine.
The layout will also be at the Great Falls Model Railroad Show on Saturday, November 4th at the Mt. Ararat High School Gym, 73 Eagles Way, in Topsham from 10am-3pm. If you can help set it up on Friday, 11/3 at 4pm or at the show on Saturday, please contact Sam.
Here is the plan for Phillips Show.
Sunday, September 17, 2017
Christmas at the Mall with Santa
This year Santa, MGRS, and
other holiday activities like Wrap for a Reason will share space where the Bon
Ton store was located. Details to follow! It
will be good to be back together with Santa!!!!
Here is the overall plan for the space. The layout is about double the size of last year because it is 24' wide instead of 12'. It may be ten trains and about 900 feet of track.
Here is the overall plan for the space. The layout is about double the size of last year because it is 24' wide instead of 12'. It may be ten trains and about 900 feet of track.
Layout Visit with Terry and Sue Norton in Eliot
Thursday, September 14, 2017
Watch for Maine Layouts in Garden Railway Magazine
Very realistic trimmed leaves
She toured the layout in detail, photographing trains, plants, buildings and scenery. Nancy and Terry also discussed his plans for a new water feature and a granite mountain that will be in the middle of the Vacation Campground.
|
Labels:
Building Projects,
Modeling Tips,
Plants,
Special Events
Westbrook Festival of Trees and "Maine Train Lines" Update
MGRS will provide the "Maine Train Lines" layout at the Westbrook Festival of Trees again this year. Paul Corbett has done this for many years, and will again provide the Garden Railway equipment, accessories and decoration.
This year some elves will run the trains. They include Doug Johnson, Art Shean, Dennis & Agnes Farrell, Paul Schnell, David Blue, Grace Miller, and Sam Carr.
The Festival runs from December 2-9. It kicks off on Saturday for "Breakfast with Santa". During the weekday mornings all the kindergarten classes in Westbrook come to see the trees, watch the trains, and have a snack with story time. It is also open for some Festival events and to the Public during specific hours.
The trees are donated by local businesses and decorated by charitable groups. Proceeds from dontations and contributions go to local charities. If you would like to help with the trains please contact Sam at 865-4467
This year some elves will run the trains. They include Doug Johnson, Art Shean, Dennis & Agnes Farrell, Paul Schnell, David Blue, Grace Miller, and Sam Carr.
The Festival runs from December 2-9. It kicks off on Saturday for "Breakfast with Santa". During the weekday mornings all the kindergarten classes in Westbrook come to see the trees, watch the trains, and have a snack with story time. It is also open for some Festival events and to the Public during specific hours.
The trees are donated by local businesses and decorated by charitable groups. Proceeds from dontations and contributions go to local charities. If you would like to help with the trains please contact Sam at 865-4467
Saturday, September 9, 2017
Robin and Bill's Train Garden
Here is a very nice "armchair" layout tour of Robin and Bill's Train Garden in Middleborough, Mass. It has trains for grandchildren, good scenery, and a pool beside the layout to jump into on those hot days!!
Wednesday, August 30, 2017
Terry & Sue Norton’s Layout Visit Coming Up on Sept. 16 - DATE CORRECTED
Our visit to Eliot is
still scheduled for Saturday, September 16 from 1-4pm. During the visit we will
also be working on the Club’s track stored in the trailer. This will include
fixing clips as needed and cleaning up. This is part of using Split Jaws for
all connections at the Mall and our other events. If you can help during your
visit, please let Sam or Terry know.
Tuesday, August 29, 2017
Jim Jenkins G Scale and On30 For Sale
You can contact Jim at 207-657-9218
if you are interested in the items he has for sale.
G Scale
Items
·
Bachman Passenger
Train with 4-4-0 black steam locomotive #9670 with sound, tender and four dark
red wood side passenger cars (two #15, two #21) including one observation car,
all steel wheels, $300
·
Two Aristocraft
aluminum rib side passenger cars with lights, New York Central “Edwin O.
Morgan” and “Seneca Falls” $100 each
·
Two battery
powered locomotives with one remote control, black 2-4-2 “Harbor Station’
99-6001-4 saddle tank with red trim, $200
·
Lionel 5103 ATSF
4-4-4 black steam locomotive and tender with box, $150
·
Three European
passenger cars tan/red “HSB” 978-407, $50 each
·
Three European
passenger cars, dark green “DR” 978-407, $60 each
·
U.S. Army
o
Flat car G4944
green with two motorized WWII Sherman Tanks, $50
o
Flat Car G4947
green with two motorized WWII Half Tracks, $50
o
USAX 12113 green
tank car, $40
·
Denver, Rio
Grande & Western
o
Bachmann black
cattle car 342, $40
o
Black flat car
53098 with three yellow generators, $75
o
Red caboose 0505
with lights wood side, steel wheels, $50
·
Colorado and
Southern
o
Three dark red
7062 Bachmann cattle cars, $40 each
o
Flat car 86402
with three reels of green cable, $50
·
Bachmann boxcar
Linville River #4 dark red, $40
·
Half-size Tank
Cars
o
ATSF 54446
blue/yellow $40
o
Santo Chemical Co
black $30
·
Bachman Hershey
Chocolate Trolley brown/white runs but some parts missing, $25
On30 Items
for Sale
·
Bachmann Spectrum
green/black 0-4-0 Davenport switcher with side rods and DCC, new in box $100
·
Rolling stock $35
each
o
PRR old style
caboose
o
PRR #125 flat car
o
Silver tank
strapped on flat car
o
Colorado &
Southern #1215 wooden boxcar
o
Colorado &
Southern cattle car
o
Wonderland
Express passenger car with interior seats
Sunday, August 27, 2017
Scott & Kris Gould's Layout Visit Re-Scheduled from September 9th to June 2018
The layout visit on September 9th to Scott and Kris Gould's layout in Cape Elizabeth has been re-scheduled to Saturday, June 2nd, 2018.
Scott is adding a new line of track and replacing existing roadbeds with concrete. This work is explained in another post about Remodeling Layouts.
Aberdaron Station
Layout Visit to Doug Johnson in Gorham
On Saturday August 26th MGRS members attended a Layout Visit at Doug Johnson's home in Gorham. It was a great day to watch trains run in the garden.
There is also a hunting scene on this layout.
Doug's Back Yard
Ben Braithwaite, John Middleton, Jen Jenkins and David Blue
Doug has two layouts in his back yard. The smaller one has a work train, two Eggliner loops, and lots of plants.
|
The hunter and the Bear beside the cabin.
Mowing a Small Lawn
The larger layout has running trains and is still under construction. It has a long outer loop, a figure 8, and a water feature with a mountain, stream and pool.
Mountain, Stream and Water Feature
Scott and Doug picking a site for the G Scale Beer Garden
Freight train running behind the lumber mill and village
Doug's next step is to add a cog railway starting at the left front of the layout and going up the side to the top of the mountain. This requires cog strips to be mounted in the middle of the track and use of an LGB Rack Rail engine with a drive gear to climb the cogs
|
Garden Railway Remodeling
Two of our members are remodeling their garden railway layouts this year.
Scott Gould is re-casting his Aberdaron Railway track bed in concrete. He likes it a lot because it guarantees a level bed (barring frost heaves) that is weed-free and easily maintained. Scott attaches the track and ballast to the concrete with silicone, which allows him to sweep or wash the track without needing to re-ballast.
![]() | ||||||
Roadbed Foundation
|
Subscribe to:
Posts (Atom)











