~ Click on Items Name below to view:~ ~ ~ Back to top of Blog
Web Home Page ~ ~Dues Info ~ ~Donations



Saturday, September 8, 2012

2012 Mall Layout

  Featuring two 100 foot main line loops crossing over the MGRS drawbridge and through tunneled areas with 20 foot diameter curves showcasing the 36 foot circular display.  Elevated lines cross metal bridges and feature 10 foot curves on Level-2 and wide 8 foot curves on Level-3.  Level-4 will be reserved for the Maine Mall Center Tree display.  All this is surrounded by six Interactive Displays!  The Circus, Lionel,  Flashing Signals, Thomas the Tank Engine, Operating Chairlift and the Sawmill.  Our control area is embedded within the layout design.  This year we will have extra room to set up display sidings close to the public for viewing trains that are not running.  These will be added as needed.    Santa Claus will be there too!  We hope all members will plan to stop by sometime over the display period and share in this major model train event that entertains and educates hundreds of interested viewers every shift.  

No comments: